Abstract
SHS investigation development is considered from the geographical and historical viewpoint. 3 stages are described. Within Stage 1 the work was carried out in the Department of the Institute of Chemical Physics in Chernogolovka where the scientific discovery had been made. At Stage 2 the interest to SHS arose in different cities and towns of the former USSR. Within Stage 3 SHS entered the international scene. Now SHS processes and products are being studied in more than 50 countries.
Abstract
In this chapter, an intervention for the Company CCEM is done, all departments in the company are analyzed, and a deep diagnosis is presented with all necessary steps. The reader may find tools and methods in this chapter that might help him prepare a similar study to a similar company in the same field or to other sorts of companies.
Keywords:
Construction field, consultancy, departments, diagnosis, electrical engineering company, final project, management, master in organizational management, mechanical engineering company, organization.
Recommended Chapters
We recommend

Authors:Bentham Science Books