Frontiers in Civil Engineering

Author(s): Aline Schaefer*, João Vitor Eccel and Enedir Ghisi

DOI: 10.2174/9781681088327121060008

The (Not So) Close Relationship Between Occupancy and Windows Operation

Pp: 178-212 (35)

Buy Chapters

* (Excluding Mailing and Handling)

  • * (Excluding Mailing and Handling)

Abstract

SHS investigation development is considered from the geographical and historical viewpoint. 3 stages are described. Within Stage 1 the work was carried out in the Department of the Institute of Chemical Physics in Chernogolovka where the scientific discovery had been made. At Stage 2 the interest to SHS arose in different cities and towns of the former USSR. Within Stage 3 SHS entered the international scene. Now SHS processes and products are being studied in more than 50 countries.

Abstract

Occupancy is one of the main factors to understand the operation and energy consumption of a building due to the variability of human behaviour. However, the variability of human behaviour is not taken into account in many thermal and energy performance studies, causing inconsistencies between simulation results and reality. One of the reasons for these inconsistencies also relies on adopting an opening availability schedule which is strictly limited to the occupancy schedule of a room, especially in residential buildings, which may not represent the reality. Thus, the aim of this study is to investigate the dependency relationship between the room’s occupancy schedule and the operation of openings in residential buildings. Data on occupancy of rooms and openings operation were obtained through a database obtained by means of application of questionnaires in low-income houses in Florianópolis, southern Brazil. Descriptive analysis by means of association measures was performed in order to evaluate the level of relationship between occupancy and openings operation. In addition, cluster analysis was performed to identify different patterns of occupant behaviour in the sample. The main result has shown that the opening operation schedule often does not depend on whether the room is occupied or not and seems to rely more accordingly to a daily routine, such as the time one wakes up or goes to sleep, or leaving and coming back home.

Recommended Chapters

We recommend

Favorable 70-S: Investigation Branching Arrow

Authors:Bentham Science Books