Abstract
SHS investigation development is considered from the geographical and historical viewpoint. 3 stages are described. Within Stage 1 the work was carried out in the Department of the Institute of Chemical Physics in Chernogolovka where the scientific discovery had been made. At Stage 2 the interest to SHS arose in different cities and towns of the former USSR. Within Stage 3 SHS entered the international scene. Now SHS processes and products are being studied in more than 50 countries.
Abstract
Due to the rising recognition of environmental sustainability, environmental assessment has been a core task for construction projects. Traditional environmental assessment of construction projects follows the Life Cycle Assessment (LCA) rule and principles, which may be time consuming and require extensive manual inputs. In recent years, many studies has been initiated to use Building Information Modelling (BIM) as the platform to host LCA implementations. Benefits, including increased productivity and flexibility, have been recorded. However, some problems, such as varied scope and definition, have also been identified. It is therefore necessary for the construction industry to understand the current status and future development of BIMintegrated LCA. A systematic review shows that BIM have been used as the platform to host LCA implementations for various project life cycles (including production, transportation, construction, operation and end-of-life stages) and environmental impacts (mainly including energy, carbon emissions, water and waste). In addition, future actions are needed in the aspect of standardization, benchmarking and available of databases in order to allow accurate comparison of the environmental performance between different projects and design alternatives.
Keywords:
BIM-integrated LCA, Building information modelling, Environmental sustainability, Life cycle assessment.
Recommended Chapters
We recommend

Authors:Bentham Science Books